DELIVERY WORKFLOW

Technical intake and rollout process

Every milestone is controlled, from feasibility review to stable handover under strict quality standards.

  1. 01

    INPUT ASSESSMENT STAGE

    Survey & requirements

    We receive CAD/STEP drawings, survey the shop floor in person and measure load parameters within 24 hours.

  2. 02

    DESIGN & ROI OPTIMISATION

    DFM & solution simulation

    Design-for-manufacturing analysis, cycle-time calculation and a quotation for the feasible option.

  3. 03

    MANUFACTURING & FACTORY TESTING

    Production & FAT testing

    Manufacturing, assembly and factory acceptance testing before the equipment leaves our workshop.

  4. 04

    HANDOVER & OPERATIONS SUPPORT

    SAT handover & O&M SOP

    Installation at your plant (SAT), SOP training for your engineers and a scheduled maintenance commitment.

98.5%
Spare parts in stockA local buffer warehouse for immediate replacement without line downtime.
< 2h
Emergency technical responseElectro-mechanical technicians on site to handle faults 24/7.
±0.002mm
Micro precisionPositional tolerance and repeatability on high-end 5-axis CNC machines.