Optimise production cycle time and eliminate cumulative machining error across complex mechanical assemblies. The customer faced high scrap rates and unplanned maintenance costs, requiring a synchronised automation line with strict micro-tolerance inspection standards.

Challenge & solution

CHALLENGE & SOLUTION

The partner plant struggled to keep high-speed stamping and the CNC machining cell stable together. Manual steps interrupted material feeding, created serious bottlenecks and wasted special alloy material. TOP WELL built a complete solution:

  • Eliminated dynamic vibration and thermal drift during 24/7 CNC operation.
  • Automated blank feeding and non-contact optical measurement to ±0.002 mm.
  • Integrated SCADA/MES industrial communication for real-time equipment monitoring.
  • Transferred standardised SOP operation procedures to the on-site engineering team.

Implementation process

Our process

Delivery followed German and Japanese industrial practice: site survey, 3D DFM/Moldflow simulation, finishing on 5-axis machining centres, Renishaw laser calibration and on-site FAT/SAT acceptance before connecting to live production.

Site survey and equipment planning
Survey & equipment planning
5-axis CNC machining and tuning
5-axis CNC machining & tuning
Laser CMM inspection and factory acceptance
Laser CMM inspection & FAT

Results & impact

RESULTS & IMPACT

After handover the project delivered a step change in real operating capability, set a new benchmark for mechanical reliability and helped the partner meet demanding global supply-chain standards:

  • 35% lower operating cost and 98% less unplanned downtime.
  • Overall equipment effectiveness (OEE) raised from 76% to 94.2%.
  • Return on investment (ROI) achieved after 14 months of operation.
  • International quality certification to ISO 9001 and AS9100.